Built Back Better Than Ever
After a kitchen fire forced them to close, Holliday Group was able to bring this Sarasota staple back to life. We did a complete gut and rebuild, which was particularly challenging as any renovation work after a fire requires special cleaning to eliminate the smoke smell. We then did a structural renovation as well as renovating all the finishes. This work was completed within 8 weeks as season was just beginning at this destination location and keeping staff and customers happy was paramount to the success of this popular restaurant and bar.
The Challenge
Complex permitting and compliance requirements for energy efficiency, fire protection, and accessibility can delay approvals and increase costs.
The Strategy
- Early Collaboration: Engage local building officials, architects, and engineers early in the design phase to preempt regulatory issues.
- BIM (Building Information Modeling): Use BIM to simulate code compliance, identify conflicts (e.g., HVAC vs. sprinkler layouts), and streamline design reviews.
Dedicated Compliance Manager: Assign a team member to track permit timelines, inspection milestones, and documentation for accountability.